Fornecedor de válvulas industriais, acessórios para tubos, flanges e bombas
Solicitar Orçamento
Lar > Produtos > Bombas > Bomba de vácuo seca
Bomba de vácuo seca - Bombas supplier | PipingX

Bomba de vácuo seca

Bomba de vácuo seca com opções em Cast iron / SS304 / Coated internals e padrão ISO 21360 / CE. Preço direto de fábrica com suporte documental OEM.

SKU: PX-VQ-364 | Quantidade mínima: 1

Especificações

Material:Cast iron / SS304 / Coated internals
Norma:ISO 21360 / CE
Vazão máx.:Up to 2,200 m3/h
Altura manométrica máx.:Ultimate vacuum up to 0.1 mbar
Faixa de temperatura:0 C to 160 C
Conexão:Flanged
Seal Type:Dry-running shaft seal
Drive Type:Direct motor / VFD ready

Principais recursos

  • -Dry compression avoids seal water consumption
  • -Suitable for clean and condensable gas handling with proper controls
  • -Low-maintenance rotor train supports continuous service
  • -Energy use can be optimized with variable-speed drive
  • -Available with filtration, knockout, and control accessories

Aplicativos

  • -Vacuum drying systems
  • -Degassing and deaeration skids
  • -Semiconductor and coating service
  • -Vacuum packaging support
  • -General process vacuum duty

Perguntas frequentes

Qual é o MOQ típico para Bomba de vácuo seca?
O MOQ padrão é de 1 unidade(s). Pedidos mistos de projeto e pacotes de peças de reposição podem ser organizados para requisitos OEM e EPC.
Quais materiais estão disponíveis para Bomba de vácuo seca?
Os materiais padrão incluem Cast iron / SS304 / Coated internals. Elastômeros, revestimentos e ligas especiais também estão disponíveis sob consulta.
É possível personalizar Bomba de vácuo seca para o projeto?
Sim. Tensão do motor, plano de selo, base, acessórios, escopo de inspeção e embalagem de exportação podem ser personalizados conforme a especificação do projeto.
Qual é o prazo de entrega e quais documentos estão disponíveis?
O prazo típico é de 3 a 6 semanas para versões padrão. Podemos fornecer datasheets, desenhos, relatórios de teste, MTC e registros de conformidade para configurações ISO 21360 / CE.

Solicite um orçamento

Compartilhe sua quantidade e especificações necessárias. Responderemos com uma oferta personalizada.

✓Resposta de cotação em 24h
✓MOQ: 1 unidades
✓Entrega em 3–5 semanas
✓Certificado ISO/API/CE

Suas informações estão seguras e não serão compartilhadas com terceiros.

Descrição do produto

Bomba de vácuo seca está disponível para transferência industrial de fluidos com materiais, conexões e documentação configuráveis. As versões típicas usam Cast iron / SS304 / Coated internals e seguem ISO 21360 / CE.

Dry Vacuum Pump is engineered for vacuum drying systems, degassing and deaeration skids, and semiconductor and coating service where uptime, hydraulic stability, and material compatibility are critical. The package is designed for industrial duty cycles and export projects that require documented quality control and repeatable performance.

Typical configurations use Cast iron / SS304 / Coated internals under ISO 21360 / CE. Options cover flanged connections, dry-running shaft seal arrangements, and direct motor / vfd ready packages so the unit can match plant utility, mounting, and maintenance standards.

The product range supports up to 2,200 m3/h, ultimate vacuum up to 0.1 mbar, and 0 c to 160 c. OEM nameplate marking, routine testing, inspection records, and reinforced export packing are available for distributor and EPC orders.

Key Features

  • Dry compression avoids seal water consumption
  • Suitable for clean and condensable gas handling with proper controls
  • Low-maintenance rotor train supports continuous service
  • Energy use can be optimized with variable-speed drive
  • Available with filtration, knockout, and control accessories
  • Specifications

  • **Material**: Cast iron / SS304 / Coated internals
  • **Standard**: ISO 21360 / CE
  • **Max Flow**: Up to 2,200 m3/h
  • **Max Head**: Ultimate vacuum up to 0.1 mbar
  • **Temperature Range**: 0 C to 160 C
  • **Connection**: Flanged
  • **Seal Type**: Dry-running shaft seal
  • **Drive Type**: Direct motor / VFD ready
  • Applications

  • Vacuum drying systems
  • Degassing and deaeration skids
  • Semiconductor and coating service
  • Vacuum packaging support
  • General process vacuum duty
  • FAQ

    1. What is the typical MOQ for Dry Vacuum Pump?

    Standard MOQ is 1 unit(s). Mixed project orders and spare-part packages can be arranged for OEM and EPC requirements.

    2. Which materials are available for Dry Vacuum Pump?

    Standard materials include Cast iron / SS304 / Coated internals. Alternative elastomers, coatings, and alloy upgrades are available on request.

    3. Can Dry Vacuum Pump be customized for project requirements?

    Yes. Motor voltage, seal plan, baseplate layout, accessories, inspection scope, and export packing can be customized to the project specification.

    4. What lead time and documents are available?

    Typical lead time is 3-6 weeks for standard builds. We can provide datasheets, drawings, test reports, MTC, and compliance records for ISO 21360 / CE configurations.

    Produtos Relacionados